Ledding Library
Project Location
Milwaukie, OR
Owner
City of Milwaukie
Architect
Hacker Architects
Engineer
ABHT
Supply Partner
RedBuilt
Market
Civic, Mass Timber
Services
General Contracting, Preconstruction, Self-Perform
Region
Pacific Northwest
Swinerton Office Location
Portland, Oregon
Keywords
Sustainable features, Library, Studies/Environmental Impact Reports (EIR)
The new 18,000-square-foot library provides community members dedicated and flexible areas for learning and reading. As the City prioritized sustainability, Swinerton provided alternative design studies during preconstruction to study several building systems. Numerous sustainable concepts were incorporated during this process, including a radiant mechanical system, a solar array, and envelope enhancements, that will help the project achieve an Energy Use Intensity (EUI) of 24.
Initially, the City of Milwaukie considered a seismic retrofit, expansion, and ADA upgrades to their existing community library first constructed in 1964. Through thoughtful due diligence and supporting cost studies provided by Swinerton, the City determined they could achieve the best value by building a new state-of-the-art library. Not only that, but it provides an added benefit by responding to the warm character of Scott Park located adjacent to the building.